PACKEX Toronto Globe-Tek at PACKEX Toronto 2009!

The Fall 2008 release of Globe-Tek Enterprise software introduced the new, integrated “Production Resource Management System” application.

This “Visual Schedule Board” component of GTE is a complete re-design and overhaul of scheduling components in the GTE application, and provides an essential functionality for companies: a dynamic production schedule with the tools for managing an optimal flow of the production process.

This re-designed Graphical User Interface tool also allows customers to greatly benefit from seamless integration with the GTE MIS/ERP system, providing direct and bidirectional input from and to the production management and production flow. No extra integration costs makes this new component a very attractive option for our customers and prospects.


Here some of the features:

  Gantt chart with a global overview of all the jobs in the plant
  Analyze tool (cost comparison when changing/switching resources)
  Grouping, compacting of jobs
  Fillers and reservations (including scheduled repetitive tasks)
  Multi-access and overlapping schedules
  What-if-scenarios
  Bottleneck detection and automatic schedule (targeting)


You are encouraged to take this opportunity to register for a demo during these three days (May 5,6 & 7th) between 11.a.m to 4 p.m by sending your email to GT Sales Canada or call 416.622.8388 ext 222.

 
     
     
     
     
     

Copyright ©2010  Globe-Tek Corporation. All Rights Reserved